| |
ADA Entrance for 100/200 Building Closed
Beginning this Friday, July 20th, renovation will require that we close the current ADA entrance to Building 100/200 located under the breezeway for an extended period. Individuals requiring ADA access will enter through the 700 Building breezeway. In the near future, the College will also add a temporary ADA ramp on the south side of Building 100/200 facing parking lot 4 (faculty parking lot). Once renovations are complete, multiple ADA access points to Building 100/200 will include an entrance from the visitors parking lot.
|